Warning: Use of undefined constant X - assumed 'X' (this will throw an Error in a future version of PHP) in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php on line 7
" /> deploying corda node – TN Blogs
Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150
Home > Tag Archives: deploying corda node

Tag Archives: deploying corda node

Implementation Deploying Cord Land

1). Preparation of the implementation plan drawing on the map 1: 5000 or 1: 2002). Surveys in the cable line clearance.3). Excavation wire line control points on each of 50 meters (injection test excavation) to examine the possibility of the existence of other utilities.4). Check the documentation asbuilt drawing other utilities.5). Preparation of supporting materials (urug Sand, Stone peg / ...

Read More »