Warning: Use of undefined constant X - assumed 'X' (this will throw an Error in a future version of PHP) in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php on line 7

Warning: Cannot modify header information - headers already sent by (output started at /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php:7) in /home/tneutron/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1902

Warning: Cannot modify header information - headers already sent by (output started at /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php:7) in /home/tneutron/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1902

Warning: Cannot modify header information - headers already sent by (output started at /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php:7) in /home/tneutron/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1902

Warning: Cannot modify header information - headers already sent by (output started at /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php:7) in /home/tneutron/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1902

Warning: Cannot modify header information - headers already sent by (output started at /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php:7) in /home/tneutron/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1902

Warning: Cannot modify header information - headers already sent by (output started at /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php:7) in /home/tneutron/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1902

Warning: Cannot modify header information - headers already sent by (output started at /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php:7) in /home/tneutron/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1902

Warning: Cannot modify header information - headers already sent by (output started at /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php:7) in /home/tneutron/public_html/wp-includes/rest-api/class-wp-rest-server.php on line 1902
{"id":4270,"date":"2023-04-04T05:47:34","date_gmt":"2023-04-03T22:47:34","guid":{"rendered":"http:\/\/www.tneutron.net\/blogs\/?p=4270"},"modified":"2023-03-31T10:20:43","modified_gmt":"2023-03-31T03:20:43","slug":"installation-and-composition-of-earth-electrodes","status":"publish","type":"post","link":"https:\/\/www.tneutron.net\/blogs\/installation-and-composition-of-earth-electrodes\/","title":{"rendered":"Installation and composition of Earth Electrodes"},"content":{"rendered":"
\n

To choose the kind of earth electrode to be used, must be considered first local conditions, soil properties and resistance grounding is allowed. The surface of the earth electrode should relate well with the surrounding soil. Stone and gravel directly on the earth electrode, will increase earthing prisoners. Electrode rod, inserted perpendicularly into the ground and adjustable length with the necessary grounding prisoners.<\/p>\n

Prisoners earthing is largely dependent on the length and \u00a0 less dependent on the size of the cross section. If multiple electrodes \u00a0 required to obtain a low earthing prisoners, then \u00a0 The minimum distance between the electrodes should be twice as long. If It \u00a0 The electrodes do not work effectively on the entire length, then \u00a0 The minimum distance between the electrodes, the length should be twice as effective.<\/p>\n

Earth conductor must be fitted with a removable connection to \u00a0 earthing prisoners testing purposes, in a place easily \u00a0 achieved and where possible, take advantage of the connection because \u00a0 installation arrangement must exist.<\/p>\n

Earth conductor connection \u00a0 earth electrode, must be mechanically strong and ensure the relationship \u00a0 electricity well, for example by using welding, clamps or bolts \u00a0 keys are not easily separated. Clamp on the pipe electrode, must \u00a0 using bolts with a minimum diameter of 10 mm.<\/p>\n

Grouping and use of the instruments of labor.<\/strong><\/p>\n<\/div>\n