If using a metal pipe with the installation must be carried out the following matters:<\/p>\n
a. Connections must be direct contact and free insulation.
\nb. The upper end of the pipe at the base of the roof beams linked with minimum 6 mm2 copper wire and welded \/ soldered.
\nc. Bottom end of the pipe is connected to the grounding wire on the low voltage crate.<\/p>\n
Construction Connection Customer Login (SMP)<\/strong> If using a metal pipe with the installation must be carried out the following matters: a. Connections must be direct contact and free insulation. b. The upper end of the pipe at the base of the roof beams linked with minimum 6 mm2 copper wire and welded \/ soldered. c. Bottom end of the pipe …<\/p>\n","protected":false},"author":1,"featured_media":4625,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[7780,7782,7786,7787,7783,7785,7784,7781,7788],"class_list":["post-4276","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-distribusi-tegangan-rendah","tag-pipe-installation","tag-pipe-installation-companies","tag-pipe-installation-cost","tag-pipe-installation-cost-estimator","tag-pipe-installation-cost-per-foot","tag-pipe-installation-jobs","tag-pipe-installation-methods","tag-pipe-installation-procedure","tag-pipe-installation-tools"],"_links":{"self":[{"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/posts\/4276","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/comments?post=4276"}],"version-history":[{"count":1,"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/posts\/4276\/revisions"}],"predecessor-version":[{"id":9211,"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/posts\/4276\/revisions\/9211"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/media?parent=4276"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/categories?post=4276"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/tags?post=4276"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}
\nThe following figure shows several types of connections Customer Login (SMP) through the frame and the roof pillars or not through the roof pole.<\/p>\n<\/div>\n
<\/a> \u00a0
<\/a><\/span> \u00a0<\/span><\/span><\/div>\n","protected":false},"excerpt":{"rendered":"