Figure II.34 rail line between the generator and Description:
\nTA: Transformer Flow
\nTT: Voltage Transformer
\nPMS: Separator switch \/ disconnecting switch (DS) PMT: Power Circuit (Circuit Breaker)<\/p>\n
The cable used is a 1-phase wiring cable consists of 3 pieces. The goal easier installation, especially the presence of a current transformer and voltage transformer as well as facilitate the repairs if there is damage to the cable. Neutral point of the generator is connected to form a relationship star. For small generators with a capacity below 5 MVA, the generator is not earthed neutral point.<\/p>\n
For generators are more than 5 MVA, are encouraged to do the generator neutral grounding point past the prisoners, coil, or a small transformer (transformer distribution) for protection. In doing grounding, use a similar cable to the cable that connects the generator to the rail. In practice, specifically large generators (above 10 MVA) performed a bifurcation to give power to the transformer’s own use.<\/p>\n
Branching on the rail line between the generator and should be avoided, and if so required implementation, by making a small rail in a special room and should be avoided because it will cause a large fault current due to its proximity to the generator and can cause fatal damage because the generator can not produce.<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"
1. Protection cable duct between the generator and rail Performed using a cable that is placed on a special channel in the soil and if it is above ground wires placed on shelves buffer that protects the cable mechanically. The mechanical protection to prevent damage to cables and can cause interference. Disorders of the cable …<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20],"tags":[4590,4591,4592,4594,4595,4593,4597,4598,4599,4596,4600],"class_list":["post-4549","post","type-post","status-publish","format-standard","hentry","category-instalasi-pembangkit-listrik","tag-generator-rail","tag-generator-rails","tag-generator-rails-gem","tag-generator-rails-plugin","tag-generator-railscast","tag-generator-rails-react","tag-rail-generator-minecraft","tag-railroad-generator","tag-rails-generator-migration","tag-rails-generator-model","tag-rails-generator-options"],"_links":{"self":[{"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/posts\/4549","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/comments?post=4549"}],"version-history":[{"count":1,"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/posts\/4549\/revisions"}],"predecessor-version":[{"id":9103,"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/posts\/4549\/revisions\/9103"}],"wp:attachment":[{"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/media?parent=4549"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/categories?post=4549"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tneutron.net\/blogs\/wp-json\/wp\/v2\/tags?post=4549"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}