{"id":1652,"date":"2023-10-14T03:17:03","date_gmt":"2023-10-13T20:17:03","guid":{"rendered":"https:\/\/www.tneutron.net\/sipil\/?p=1652"},"modified":"2023-10-10T14:03:37","modified_gmt":"2023-10-10T07:03:37","slug":"stable-channel-planning-wasters","status":"publish","type":"post","link":"https:\/\/www.tneutron.net\/sipil\/stable-channel-planning-wasters\/","title":{"rendered":"Stable Channel Planning Wasters"},"content":{"rendered":"<p><span class=\"notranslate\">Planning exhaust duct should provide a cost breakdown of the execution and maintenance of the minimum.<\/span> <span class=\"notranslate\"> Segments of the channel should be stable against erosion and sedimentation should be minimal at every cross-section and must be balanced.<\/span> <span class=\"notranslate\"> With the waster water from rice fields to be cleaner than the sediment.<\/span> <span class=\"notranslate\"> Erosion in the discharge channel will be the decisive criterion.<\/span><br \/>\n<span class=\"notranslate\"> Free flow of the plan should not exceed the maximum allowable speed.<\/span><\/p>\n<p><span class=\"notranslate\"> Maximum permitted speed depending on soil type and condition.<\/span> <span class=\"notranslate\"> Waster channel designed in the lowest and through the depressed areas.<\/span> <span class=\"notranslate\"> The natural slope of the land determines the slope of the discharge channel extends.<\/span> <span class=\"notranslate\"> When the bottom slope is too steep and maxi-mum speed will be exceeded, it must be made of the building falls.<\/span> <span class=\"notranslate\"> Free plan should be taken at or near the maximum allowable speed, because the discharge plan or peak discharge is not often the case, the discharge and velocity of water flow in the discharge channel will be lower under average conditions.<\/span><\/p>\n<p><span class=\"notranslate\"> If the discharge flow is low, the flow will tend to be meandering when the basic channel width.<\/span> <span class=\"notranslate\"> Therefore typically designed relatively narrow discharge channel and in comparison to the irrigation channel.<\/span> <span class=\"notranslate\"> Variations in water level at the rate that varies, usually does not have significance in other discharge channel.<\/span> <span class=\"notranslate\"> The cross-section will provide a more economical solution.<\/span> <span class=\"notranslate\"> In planning for land drainage system there are some data that must be provided, namely, (1) a description of the physical environment of the drainage system, (2) land use, (3) other infrastructure, (4) topography, (5) the natural flow patterns.<\/span><\/p>\n<p><span class=\"notranslate\"><strong>A. Description of the Physical Environment Drainage Systems<\/strong><\/span><br \/>\n<span class=\"notranslate\"> In planning the layout of the drainage network.<\/span> <span class=\"notranslate\"> description of the physical environment is a very important information.<\/span> <span class=\"notranslate\"> Channel placement.<\/span> <span class=\"notranslate\"> density of buildings and the number of such facilities will be strongly influenced by the condition of the region will be affected oieh conditions of the plan area.<\/span> <span class=\"notranslate\"> In this regard, a planner is required to always be sensitive in interpreting the data provided in the form of secondary data such as base maps and flood phenomena that have occurred, as well as the existing natural flow patterns.<\/span> <span class=\"notranslate\"> Where information about the natural flow patterns can also be obtained and direct observation in the field when it rains (floods).<\/span><\/p>\n<p><span class=\"notranslate\"> <strong>B. Land Use<\/strong><\/span><br \/>\n<span class=\"notranslate\"> A land use map which can describe the pattern of the lawyer-use of land area drainage plan.<\/span> <span class=\"notranslate\"> The pattern of land use in question should include on existing conditions as well as plans for future development.<\/span> <span class=\"notranslate\"> The information is needed to determine the scope of the necessary drainage system and to plan drainage level according to the category of land use of the area.<\/span><\/p>\n<p><span class=\"notranslate\"> <strong>C. Other infrastructure<\/strong><\/span> <strong><br \/>\n<\/strong> <span class=\"notranslate\"> Information about the other infrastructure shall include road networks and other networks which are expected to cause a disruption in the drainage system.<\/span> <span class=\"notranslate\"> It is intended as a consideration in determining the height of the drainage channels and to identify the type of building which required investigation.<\/span><\/p>\n<p><span class=\"notranslate\"> <strong>D. Topography<\/strong><\/span><br \/>\n<span class=\"notranslate\"> The information required to determine the direction of drainage channels and boundaries penanmpungnya.<\/span> <span class=\"notranslate\"> Mapping the contours on a farm needs to be done on a scale of 1: 5000 or 1: 10,000 with different contours on a flat area of 0.5 meters, and 1.0 meters depending on the contours of the steep terrain.<\/span> <span class=\"notranslate\"> Mapping the need to refer to a bench mark in the field known.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Planning exhaust duct should provide a cost breakdown of the execution and maintenance of the minimum. Segments of the channel<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","footnotes":""},"categories":[1865],"tags":[2368,2369,2370,2361,2365,2363,2366,2362,2367,2364],"class_list":["post-1652","post","type-post","status-publish","format-standard","hentry","category-english","tag-planning-stable-yard","tag-stable-conversion-planning-permission","tag-stable-financial-planning-evesham","tag-stable-planning","tag-stable-planning-application","tag-stable-planning-design","tag-stable-planning-drawings","tag-stable-planning-permission","tag-stable-planning-permission-uk","tag-stable-planning-regulations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Stable Channel Planning Wasters - TN Sipil<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.tneutron.net\/sipil\/stable-channel-planning-wasters\/\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Stable Channel Planning Wasters - TN Sipil\" \/>\n<meta name=\"twitter:description\" content=\"Planning exhaust duct should provide a cost breakdown of the execution and maintenance of the minimum. Segments of the channel\" \/>\n<meta name=\"twitter:creator\" content=\"@t_neutron\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Taufiqullah\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.tneutron.net\\\/sipil\\\/stable-channel-planning-wasters\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.tneutron.net\\\/sipil\\\/stable-channel-planning-wasters\\\/\"},\"author\":{\"name\":\"Taufiqullah\",\"@id\":\"https:\\\/\\\/www.tneutron.net\\\/sipil\\\/#\\\/schema\\\/person\\\/b57f791b694136047454bb6ac5cbe375\"},\"headline\":\"Stable Channel Planning Wasters\",\"datePublished\":\"2023-10-13T20:17:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.tneutron.net\\\/sipil\\\/stable-channel-planning-wasters\\\/\"},\"wordCount\":560,\"keywords\":[\"planning stable yard\",\"stable conversion planning permission\",\"stable financial planning evesham\",\"Stable Planning\",\"stable planning application\",\"stable planning design\",\"stable planning drawings\",\"stable planning permission\",\"stable planning permission uk\",\"stable planning regulations\"],\"articleSection\":[\"English\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.tneutron.net\\\/sipil\\\/stable-channel-planning-wasters\\\/\",\"url\":\"https:\\\/\\\/www.tneutron.net\\\/sipil\\\/stable-channel-planning-wasters\\\/\",\"name\":\"Stable Channel Planning Wasters - TN Sipil\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.tneutron.net\\\/sipil\\\/#website\"},\"datePublished\":\"2023-10-13T20:17:03+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.tneutron.net\\\/sipil\\\/#\\\/schema\\\/person\\\/b57f791b694136047454bb6ac5cbe375\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.tneutron.net\\\/sipil\\\/stable-channel-planning-wasters\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.tneutron.net\\\/sipil\\\/stable-channel-planning-wasters\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.tneutron.net\\\/sipil\\\/stable-channel-planning-wasters\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.tneutron.net\\\/sipil\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Stable Channel Planning Wasters\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.tneutron.net\\\/sipil\\\/#website\",\"url\":\"https:\\\/\\\/www.tneutron.net\\\/sipil\\\/\",\"name\":\"TN Sipil\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.tneutron.net\\\/sipil\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.tneutron.net\\\/sipil\\\/#\\\/schema\\\/person\\\/b57f791b694136047454bb6ac5cbe375\",\"name\":\"Taufiqullah\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcdf36434717ce57bea7f17eb3c140a2ff8def45941b720aa8fc1cccd6cdd505?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcdf36434717ce57bea7f17eb3c140a2ff8def45941b720aa8fc1cccd6cdd505?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcdf36434717ce57bea7f17eb3c140a2ff8def45941b720aa8fc1cccd6cdd505?s=96&d=mm&r=g\",\"caption\":\"Taufiqullah\"},\"description\":\"Taufiqullah\",\"sameAs\":[\"http:\\\/\\\/www.tneutron.net\",\"https:\\\/\\\/x.com\\\/t_neutron\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Stable Channel Planning Wasters - TN Sipil","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.tneutron.net\/sipil\/stable-channel-planning-wasters\/","twitter_card":"summary_large_image","twitter_title":"Stable Channel Planning Wasters - TN Sipil","twitter_description":"Planning exhaust duct should provide a cost breakdown of the execution and maintenance of the minimum. Segments of the channel","twitter_creator":"@t_neutron","twitter_misc":{"Written by":"Taufiqullah","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.tneutron.net\/sipil\/stable-channel-planning-wasters\/#article","isPartOf":{"@id":"https:\/\/www.tneutron.net\/sipil\/stable-channel-planning-wasters\/"},"author":{"name":"Taufiqullah","@id":"https:\/\/www.tneutron.net\/sipil\/#\/schema\/person\/b57f791b694136047454bb6ac5cbe375"},"headline":"Stable Channel Planning Wasters","datePublished":"2023-10-13T20:17:03+00:00","mainEntityOfPage":{"@id":"https:\/\/www.tneutron.net\/sipil\/stable-channel-planning-wasters\/"},"wordCount":560,"keywords":["planning stable yard","stable conversion planning permission","stable financial planning evesham","Stable Planning","stable planning application","stable planning design","stable planning drawings","stable planning permission","stable planning permission uk","stable planning regulations"],"articleSection":["English"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.tneutron.net\/sipil\/stable-channel-planning-wasters\/","url":"https:\/\/www.tneutron.net\/sipil\/stable-channel-planning-wasters\/","name":"Stable Channel Planning Wasters - TN Sipil","isPartOf":{"@id":"https:\/\/www.tneutron.net\/sipil\/#website"},"datePublished":"2023-10-13T20:17:03+00:00","author":{"@id":"https:\/\/www.tneutron.net\/sipil\/#\/schema\/person\/b57f791b694136047454bb6ac5cbe375"},"breadcrumb":{"@id":"https:\/\/www.tneutron.net\/sipil\/stable-channel-planning-wasters\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.tneutron.net\/sipil\/stable-channel-planning-wasters\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.tneutron.net\/sipil\/stable-channel-planning-wasters\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.tneutron.net\/sipil\/"},{"@type":"ListItem","position":2,"name":"Stable Channel Planning Wasters"}]},{"@type":"WebSite","@id":"https:\/\/www.tneutron.net\/sipil\/#website","url":"https:\/\/www.tneutron.net\/sipil\/","name":"TN Sipil","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.tneutron.net\/sipil\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.tneutron.net\/sipil\/#\/schema\/person\/b57f791b694136047454bb6ac5cbe375","name":"Taufiqullah","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/dcdf36434717ce57bea7f17eb3c140a2ff8def45941b720aa8fc1cccd6cdd505?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/dcdf36434717ce57bea7f17eb3c140a2ff8def45941b720aa8fc1cccd6cdd505?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/dcdf36434717ce57bea7f17eb3c140a2ff8def45941b720aa8fc1cccd6cdd505?s=96&d=mm&r=g","caption":"Taufiqullah"},"description":"Taufiqullah","sameAs":["http:\/\/www.tneutron.net","https:\/\/x.com\/t_neutron"]}]}},"_links":{"self":[{"href":"https:\/\/www.tneutron.net\/sipil\/wp-json\/wp\/v2\/posts\/1652","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tneutron.net\/sipil\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tneutron.net\/sipil\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tneutron.net\/sipil\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tneutron.net\/sipil\/wp-json\/wp\/v2\/comments?post=1652"}],"version-history":[{"count":1,"href":"https:\/\/www.tneutron.net\/sipil\/wp-json\/wp\/v2\/posts\/1652\/revisions"}],"predecessor-version":[{"id":3501,"href":"https:\/\/www.tneutron.net\/sipil\/wp-json\/wp\/v2\/posts\/1652\/revisions\/3501"}],"wp:attachment":[{"href":"https:\/\/www.tneutron.net\/sipil\/wp-json\/wp\/v2\/media?parent=1652"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tneutron.net\/sipil\/wp-json\/wp\/v2\/categories?post=1652"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tneutron.net\/sipil\/wp-json\/wp\/v2\/tags?post=1652"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}