Warning: Use of undefined constant X - assumed 'X' (this will throw an Error in a future version of PHP) in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php on line 7
" /> Taufiqullah – Page 82 – TN Blogs
Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150
Home > Author Archives: Taufiqullah (page 82)

Author Archives: Taufiqullah

Telekomunikasi Industri Tenaga Listrik

Kelasifikasi Yang termasuk dalam telekomunikasi untuk industri tenaga listrik adalah semua fasilitas telekomunikasi yang diperlukan dalam pengelolaan perusahaan tenaga listrik, diantaranya yang menyangkut penyediaan dan kebutuhan, operasi, pengamanan dan pemeliharaan. Jaringan telekomunikasi ini merupakan sistem syaraf dalam pengelolaan perusahaan. Makin maju perusahaannya makin penting adanya fasilitas yang dapat diandalkan dan komunikasi yang cepat. Sistem telekomunikasi ini dapat dibagi menjadi komunikasi ...

Read More »

Fungsi Layanan Makanan dan Minuman

Penghasilan terbesar dari pengelolaan sebuah hotel adalah penjualan kamar, dan penghasilan kedua terbesar adalah penjualan makanan dan minuman, baik yang dijual di outlet–outlet restoran yang dimiliki oleh hotel tersebut maupun penjualan makanan dan minuman melalui layanan kamar ( room service ) pelaksanaan penyediaan dan pengolahan, penyajian dan penjualan makanan dan minuman berada di bawah tanggung jawab Divisi Makanan dan Minuman ...

Read More »

Compiling RAB and RKS

Build a house, a good simple home, home being, as well as luxury homes, homes to live alone or as an investment property in the future as well as public consumption requires no small cost. This requires careful calculations, both the amount of the cost of manufacture, the volume of work and type of work, materials prices, labor costs, and ...

Read More »

Installation and composition of Earth Electrodes

To choose the kind of earth electrode to be used, must be considered first local conditions, soil properties and resistance grounding is allowed. The surface of the earth electrode should relate well with the surrounding soil. Stone and gravel directly on the earth electrode, will increase earthing prisoners. Electrode rod, inserted perpendicularly into the ground and adjustable length with the ...

Read More »

Tools Cable Channels Land

1) The use of working with the right tools. If we can use the tools work properly, then in carrying out the work will gain the following benefits; a)       Increased work efficiency, b)       Total consumption / labor deployment is reduced, c)       shorter implementation time / work quickly resolved, d)      Better quality jobs, e)       Financing decreased, ...

Read More »

Implementation Deploying Cord Land

1). Preparation of the implementation plan drawing on the map 1: 5000 or 1: 2002). Surveys in the cable line clearance.3). Excavation wire line control points on each of 50 meters (injection test excavation) to examine the possibility of the existence of other utilities.4). Check the documentation asbuilt drawing other utilities.5). Preparation of supporting materials (urug Sand, Stone peg / ...

Read More »