Warning: Use of undefined constant X - assumed 'X' (this will throw an Error in a future version of PHP) in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php on line 7
" /> Limitation Channel Conductor – TN Blogs
Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150
Home > Distribusi Tegangan Rendah > Limitation Channel Conductor

Limitation Channel Conductor

As we know that the price of the conductor around 40% of the price per kilometer network. Limitations are as follows:

a) Pull AAAC is allowed a maximum of 30% of the tensile strength (ultimate tensile strength).
b) Pull the cable Twisted maximum allowable 35% of the tensile strength of the wire hanger.
c) sagging that occurs in SUTR with a distance of 35-50 meters of the goal, should not be more than 1 meter.

In the construction of low or medium voltage networks should be noted that the track will be skipped cable channels, for example during aerial cable crossing a public road, aerial cables installed under construction, aerial cable across the river, and the other path-pass that need attention in connection with security Safety cables and those around the cable.

The following are some examples of air passing through the cable channels that location, and measures for environmentally safe distance listed can be used as a reference in melaksanakaan duty cabling.

  clip_image002   clip_image004  
  clip_image005   clip_image006
Figure 4-8. Two aerial cables (SUTM & SUTR) mounted on a pole

h> 1 m if the voltage is higher than channel 2 1 3 0 V and lower than 5 7 kV
h> 2 m if the voltage channel 2 is higher than 5 7 kV

  clip_image007
Figure 4-10. Aerial cables that pass next to a bridge