Warning: Use of undefined constant X - assumed 'X' (this will throw an Error in a future version of PHP) in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php on line 7
" /> TN Blogs – Page 84
Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Finishing Dinding

Dinding yang telah selesai dipasang perlu dilindungi (ditutup) dengan suatu lapisan dari adukan spesi, agar tembok itu lebih rapi dan indah. Khusus bidang dinding bagian bawah yang berhubungan langsung dengan tanah diplester kedap air setinggi ± 20 cm. Sebelum memulai dengan pekerjaan plesteran, terlebih dahulu serpihan-serpihan adukan, debu atau kotoran-kotoran lain, yang menempel pada tembok perlu dibersihkan dengan cara menyiramkan ...

Read More »

Check Valve

A. Pilot check valve Fungsi pilot check valve ialah mencegah terjadinya drop (turun) pada perlengkapan kerja (attaccement) pada saat katup pengontrol posisi netral. Contoh pemakaian pilot check valve ini ialah pada unit motor grader. Konstruksi dan simbol pilot check valve dapat dilihat pada gambar 4.131 (a) dan gambar 4.131 (b) dan cara kerja pada gambar 4.132    Gambar 4.131 (a) ...

Read More »

Hard Body Clay Minerals Wet

Processing masinal clay is wet with material prepared from hard clay minerals is generally applied to the treated firms medium and large-scale ceramics. The process is generally about the same the only difference being the clay material and equipment capacity used. Materials prepared clay from the hard mineral materials processed is pure clay shaped like a soft dry flour so ...

Read More »

Images Work and List of Components

Working drawings are the basis for the executor to carry out building work in the field. Working drawings are based on the construction drawings that contain the details of each component of the building work. Some of the components that are working drawings; 1. Picture foundation, 2. Picture reinforcement concrete (Sloof, columns and ring beam), 3. Picture walls and plastering, ...

Read More »

Components RAB and RKS

Components in the calculation of the cost of the building consists of: 1. Develop job descriptions and material specifications and requirements, 2. Calculation of the volume of work, 3. Creating a list of the volume of work, the unit price of materials and labor costs, 4. Creating a list of unit of analysis, 5. Creating a list of unit price ...

Read More »

Prosedur Perlengkapan Untuk Tamu

Pengiriman Barang untuk dipinjam tamu • Memilih dan memeriksa barang dalam keadaan bersih dan berfungsi baik • Mencatat barang dan kepada siapa barang tersebut dikirimkan • Kirimkan barang dan atur peletakannya dengan tepat. Beritahukan kepada tamu tentang pemakaiannya, jika diperlukan. Gunakan nama tamu ketika mengirim barang. • Kumpulan formulir pinjaman setelah ditandatangani tamu dan tinggalkan lembar salinannya untuk tamu (yang ...

Read More »