If using a metal pipe with the installation must be carried out the following matters: a. Connections must be direct contact and free insulation. b. The upper end of the pipe at the base of the roof beams linked with minimum 6 mm2 copper wire and welded / soldered. c. Bottom end of the pipe is connected to the grounding ...
Read More »