Warning: Use of undefined constant X - assumed 'X' (this will throw an Error in a future version of PHP) in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php on line 7
" /> Use of Pipe Installation – TN Blogs
Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150
Home > Distribusi Tegangan Rendah > Use of Pipe Installation

Use of Pipe Installation

If using a metal pipe with the installation must be carried out the following matters:

a. Connections must be direct contact and free insulation.
b. The upper end of the pipe at the base of the roof beams linked with minimum 6 mm2 copper wire and welded / soldered.
c. Bottom end of the pipe is connected to the grounding wire on the low voltage crate.

Construction Connection Customer Login (SMP)
The following figure shows several types of connections Customer Login (SMP) through the frame and the roof pillars or not through the roof pole.

  clip_image002   clip_image004  


Notice: Undefined index: tie_hide_share in /home/tneutron/public_html/wp-content/themes/jarida_disabled/single.php on line 79