Warning: Use of undefined constant X - assumed 'X' (this will throw an Error in a future version of PHP) in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php on line 7
" /> Pondasi dan Dinding – Page 2 – TN Blogs
Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150
Home > Pondasi dan Dinding (page 2)

Pondasi dan Dinding

Work Measurement and Board Duga

1. Embed in a row of stakes are put in the position of the pull of the thread (line BA) as the basis for measuring building. 2. Pancangkan row of stakes according to the position of line CD is made perpendicular to the line BA by using Pythagoras’ arguments ratio (3:4:5). 3. The same way, pancangkan row of peg-pa-tock along ...

Read More »

Preparing Stone Masonry Materials

1. Locations Stone Masonry The things that need to be prepared on-site masonry work is; a. In the work of cleaning up the work site of garbage that would impede the course of the work is always done at the beginning of the job. These jobs do not require too great power unless it is a big job that will ...

Read More »