Warning: Use of undefined constant X - assumed 'X' (this will throw an Error in a future version of PHP) in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php on line 7
" /> Work Measurement and Board Duga – TN Blogs
Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150
Home > Pondasi dan Dinding > Work Measurement and Board Duga

Work Measurement and Board Duga

1. Embed in a row of stakes are put in the position of the pull of the thread (line BA) as the basis for measuring building.
2. Pancangkan row of stakes according to the position of line CD is made perpendicular to the line BA by using Pythagoras’ arguments ratio (3:4:5).
3. The same way, pancangkan row of peg-pa-tock along the lines EF and GH.
4. At each location markers mark ± 0.00 expected points by creating a flat surface on each peg.

clip_image002

Figure III-9, Employment Uitzet and Bouwplank
 
5. Attach bouwplank with reference to the expected point.
6. Determine the location of points on the board walls axis bouwplank, then plug it in and mark it with nail polish or marry.


Notice: Undefined index: tie_hide_share in /home/tneutron/public_html/wp-content/themes/jarida_disabled/single.php on line 79