Warning: Use of undefined constant X - assumed 'X' (this will throw an Error in a future version of PHP) in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php on line 7
" /> Completeness Power Center – TN Blogs
Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150
Home > Pembangkit Tenaga Listrik > Completeness Power Center

Completeness Power Center

Completeness of the power station are:

a) Installation of energy sources (primary energy, which is the installation of fuel for thermal plants and hydroelectric or installation)
b) Installation of the engine driving an electric generator, which is the installation that serves as the primary energy conversion into mechanical energy as the driving electrical generators
c) The machine drive electrical generators can be derived from the boilers along with steam turbines, diesel engines, gas turbines and water turbines
d) Cooling installations, ie installations which cools the engine of installations that use fuel.
e) Electrical Installations, which outlines the installation consists of:
1)       High voltage installations, ie installations that are used to deliver electrical energy electric generators dlibangkitkan
2)       Installation of low voltage, namely the installation of auxiliary equipment and lighting installations,
3)       Direct current installations, ie installations and equipment storage battery filling and direct current network primarily used for protection, control, and telecommunications.

The things to consider in the planning of generation (system planning) power
Yan things need to be considered in planning for power generation are:
a) Estimated burden
Issues relating to the generation period (eg, 15-20 years), a large peak load, daily load, and annual load, and others associated with the time period.
b) development planning
Capacity planning must be done, poduksi costs, and taking into account investments and the income or outcome. Figure I.4 shows the removal of the transformer by crane to the development of power plants.

clip_image001
Figure I.4 Appointment transformer using cranes to Develop Power Centerc) Planning the distribution
Diantarannya is noticed tansmisi development from year to year, transmission system, the cost of land acquisition through transmission, interconnection systems, circuit transmission installation, construction costs of transmission, transmission systems, and others. Figure I.5 shows an example of the construction of the transmission.

clip_image002  
Figure I.5 Example of Transmission Constructiond) Planning subtransmisi
e) Planning distribution
Noting plan major supply station at bulk, large voltage subtransmisi, subtransmisi network systems, and others.

  clip_image003   clip_image004
Figure I.6 Sample distribution network constructionf) Planning the operation
Operation of the system plan, plan computer program, load flow program, and others in order to be effective and efficient operation. Figure I.7 shows the grid system in power plant operation.

  clip_image005
Figure I.7 Grid System Operation at Power Plantg) Fuel Supply
Baiak material requirements plan or a primary energy source, fuel availability, delivery systems, and others.
h) Environmental planning (planning environment) or planning environmental conditions. Taking into account the surrounding environment, plant shape, location, and design of sewage treatment, and others. Example
diesel development that takes into account the environment shown in Figure I.8.
i) Planning earnings
j) Research and development

Research and development related to the development of power systems, including the cost, characteristics, and the feasibility of alternative energy sources and the development of technology, and others.

clip_image006
Figure I.8 noticed diesel Development Environment


Notice: Undefined index: tie_hide_share in /home/tneutron/public_html/wp-content/themes/jarida_disabled/single.php on line 79