Warning: Use of undefined constant X - assumed 'X' (this will throw an Error in a future version of PHP) in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php on line 7
" /> Plastering and Wall Field – TN Blogs
Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150
Home > Finishing Dinding > Plastering and Wall Field

Plastering and Wall Field

1. Terms plaster wall:

  1. Walls will be plastered must be flat.
  2. Before starting the plastered walls must be carded with broom and cleaned with fresh water (drinking water).
  3. Thick layers of plaster only 1 @ 1,5 cm.
  4. Digesters are used: 1 lime: 1 tras: 3 sand, if necessary, can be made 1 cement: 3 sand.
2 Implementation of plaster walls:
  1. Plastered wall will be divided into several sections (plots).
  2. At the four corners of the plot wall mounted with the head protruding nails. ± 3 cm from the field wall, to stretch the thread.
  3. Distance threads of 1.5 cm and a side wall when the wall is attached to the thread, then the wall must first carved plaster in order to obtain the same thickness and average.
  4. In certain places, namely on the nails and stretch yarns made of plaster that coincide with the major threads of earlier, as the standard thick plaster.
  5. The main vertical plaster is made of each distance of 1.00 meters. Once this is completed, the thread can be removed.
  6. Among the 2 lane main contents plaster filled with mortar, then scratched with a great ruler and straight from the ground up to obtain a flat field.
  7. Then the area of the outermost layer is coated with a dilute (red cement + lime + water) while buffed with rubbing boards so standard flat surface, this is called mengaci.
  8. Ribs and the meeting point of the plaster walls must angles (= 90 °) and this should be plastered with cement mortar 1: 3 sand to be resistant light collisions.
  9. Once the layer is really dry, the surface areas were washed with quicklime 3 times, and make it look beautiful lime is mixed with the dye according to the tastes of the owner of the building
3 Things You Should Look For:
  1. Materials such as sand mortar plaster, and lime tras have to be sifted thoroughly mixed first, so that the grains do not participate rough mix.
  2. Try not to use the former walls of the old mortar adhesion due to lack of power.
  3. At work mengaci, when the chalk bucket of water before kapumya is up, just stay coarse granules that must be removed and replaced with a mixture of equal and new.
4 How old plaster wall:
  1. Previous layer must be peeled old wall plaster.
  2. Upright or flat broadcast broadcast must carded ± 1.5 em deep.
  3. Part brick wall lumutan (slippery) must be carded so rough surface, so that layers of plaster that can be attached to either bam.
  4. If any part of the wall that is too dry, should be moistened with fresh water.
  5. Furthermore, following the execution of plaster on top of no steps. 1 to 9.
  clip_image002  
Figure V-1, Plastering Work