Warning: Use of undefined constant X - assumed 'X' (this will throw an Error in a future version of PHP) in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions.php on line 7
" /> Maintenance Building Floor Coverings – TN Sipil
Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150

Notice: Undefined index: font in /home/tneutron/public_html/wp-content/themes/jarida_disabled/functions/common-scripts.php on line 150
Home > English > Maintenance Building Floor Coverings

Maintenance Building Floor Coverings

1) Floor plastering
Maintenance steps are performed:
a) The floor is cleaned of trash and dust with brooms, then mopped with a mop and clean water.
b) The floors were stained, plastic brush cleaned with detergent and water and then dried.

2) Floor tiles terrazzo
Maintenance steps are performed:
a) The floor is cleaned of trash and dust with brooms, then mopped with a cloth bersih.Pembersihan done every day.
b) The floors were stained, plastic brush cleaned with detergent and water and then dried.
c) Floor tiles

Maintenance steps are performed:
1. The floor is cleaned of trash and dust with brooms, then mopped with a mop and clean water. Cleaning is done every day.
2. The floors were stained, plastic brush cleaned with detergent and water and then dried. Can also be used thinner, to stain which has strong adhesive power, then rinse again with clean water and dry with a cloth.

Painting Brick Wall
Painting the walls of the building needs to be done to maintain the performance of buildings, both for the inner and outer walls of the building. The walls of the building should be repainted at least once every 2 (two) years, while the exterior wall painted a minimum of every 3 (three) years. Painting wear a type of paint with the appropriate characteristics, for inside and outside the building.

Maintenance steps are performed:
a) Remove dust and cobwebs attached to the wall with a broom and brush every day.
b) The dirt can be cleaned with a brush attached to a smooth plastic, cleaned with water and dried. If possible can be coated again with the appropriate paint.

Follow-Care Building Components
Damage caused to the building needs to be followed up immediately with a follow treatment to restore the function of the building and support the process of education services. The first step that needs to be done is the identification of the damage and continue with improvement through the implementation methods adapted to the type and level of care kerusakannya.Tindakan building should consult with the technical team (consultants) or Technical Office in charge of the building.

Technical implementation involves the technical implementation or an experienced craftsman related to the type and extent of damage. The scope of the offense of care delivered in this section are additional insight for the schools and directed at the components of the structure and architecture as part most often damaged.


Notice: Undefined index: tie_hide_share in /home/tneutron/public_html/wp-content/themes/jarida_disabled/single.php on line 79